skip to main content

Concrete Construction - Unit 3: Placing And Compaction

33 minutes

Videos are generally available for preview to non-members as short clips. Limited full-length titles are also available. Log In to view the full length title.

Browse Full-length Non-member Titles
Still image from Concrete Construction - Unit 3: Placing And Compaction

Examines the methods and practice of placing and compacting concrete (getting rid of trapped air using pokers and vibrators). Covers column, wall, and slab-casting operations. Details of the operations are highlighted, including placement in layers and treatment at joints.

Media Details

Runtime: 33 minutes

Request a DVD
Members Only - Apply Now
Concrete Construction
Episode 1
30 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 2
42 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 3
33 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 4
35 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 5
42 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 6
30 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 7
25 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 8
41 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 9
36 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 10
42 minutes
Grade Level: 10 - 12