skip to main content

Concrete Construction - Unit 11: Curing And Protecting Concrete And Striking Formwork

21 minutes 59 seconds

Videos are generally available for preview to non-members as short clips. Limited full-length titles are also available. Log In to view the full length title.

Browse Full-length Non-member Titles
Still image from Concrete Construction - Unit 11: Curing And Protecting Concrete And Striking Formwork

Concentrates on methods of curing (how the concrete increases in strength) and protecting concrete. Tells how and when to strike (remove) formwork. Produced in England. Refers to British standards and regulations.

Media Details

Runtime: 21 minutes 59 seconds

Request a DVD
Members Only - Apply Now
Concrete Construction
Episode 1
29 minutes 54 seconds
Grade Level: 10 - 12
Concrete Construction
Episode 2
41 minutes 21 seconds
Grade Level: 10 - 12
Concrete Construction
Episode 3
32 minutes 13 seconds
Grade Level: 10 - 12
Concrete Construction
Episode 4
35 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 5
40 minutes 29 seconds
Grade Level: 10 - 12
Concrete Construction
Episode 6
30 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 7
25 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 8
40 minutes 54 seconds
Grade Level: 10 - 12
Concrete Construction
Episode 9
36 minutes
Grade Level: 10 - 12
Concrete Construction
Episode 10
43 minutes 32 seconds
Grade Level: 10 - 12